欢迎来到环境100文库! | 帮助中心 分享价值,成长自我!

环境100文库

换一换
首页 环境100文库 > 资源分类 > PDF文档下载
 

欧盟碳排放交易系统的运营经验:合规视角.pdf

  • 资源ID:8457       资源大小:259.12KB        全文页数:11页
  • 资源格式: PDF        下载权限:游客/注册会员/VIP会员    下载费用:8碳币 【人民币8元】
快捷注册下载 游客一键下载
会员登录下载
三方登录下载: 微信开放平台登录 QQ登录   微博登录  
下载资源需要8碳币 【人民币8元】
邮箱/手机:
温馨提示:
支付成功后,系统会自动生成账号(用户名和密码都是您填写的邮箱或者手机号),方便下次登录下载和查询订单;
支付方式: 支付宝    微信支付   
验证码:   换一换

加入VIP,免费下载
 
友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,既可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰   

欧盟碳排放交易系统的运营经验:合规视角.pdf

EU ETS Operator Experience 1 January 2015 EDF Energy plc. All rights Reserved 1 EU ETS Operator Experience Compliance Perspective EDF Energy – Cottam Power Station – 7 September 2015EU ETS Operator Experience 1 January 2015 EDF Energy plc. All rights Reserved 2 Contents Interaction with the Environment Agency Key challenges and lessons learntEU ETS Operator Experience 1 January 2015 EDF Energy plc. All rights Reserved 3 Interaction with the Environment Agency 1 Environment Agency EA are the UK regulator and involve industry to discuss the interpretation and implementation of EU ETS legislation at the installation level - This approach enables potential issues to be identified in advance and resolved - Most of the time a solution can be found which is acceptable to both regulator and operator - A key issue for operators was to make it clear that “one size does not fit all” i.e. different approaches are equally valid because they produce the same accurate CO2 resultEU ETS Operator Experience 1 January 2015 EDF Energy plc. All rights Reserved 4 Interaction with the Environment Agency 2 The interaction is achieved in the UK via the Joint Environmental Programme JEP - A al network of major thermal plant operators in the UK Since Phase 1, JEP have produced and agreed with the EA a detailed guidance document on how EU ETS compliance can be delivered at power stations - All major thermal plant operators have provided - Demonstrates that PARR or analysed carbon is acceptable see next slide - Gives operators access to advanced technical arguments / non-typical power station skillsets such as uncertainty analysis to use when applying for a permit - Provides EA permitting officers with the comfort that their managers have agreed the proposed approach, making the permit determination process efficientEU ETS Operator Experience 1 January 2015 EDF Energy plc. All rights Reserved 5 Interaction with the Environment Agency 3 PARR ula calculated carbon vs analysed carbon Cottam, along with some other power stations, has a Fuel Management System and reporting process built entirely on the Parr ula JEP study of 1000 samples demonstrates that either is acceptable Based on the comprehensive study the EA were able to agree that either can be used Similar approach in respect of heat account and stock surveys for activity data as existing belt weighers not accurate enough for Major Source Tier accuracy requirementsEU ETS Operator Experience 1 January 2015 EDF Energy plc. All rights Reserved 6 Interaction with the Environment Agency 4 Toward end of Phase 2, EA introduced website-based system “ETSWAP” - Reporting system and library of all EA interactions with the installation - A good system which is user-friendly - Makes data transfer errors within EA systems less likely as ETSWAP enables automatic transfers rather than manual transfers The application of the tier system continues to work extremely well in practice and remains proportionate and fair - Example Coal is 98 of total emission whilst propane is only 0.000005 of the total emission - Coal uncertainty of 0.5 means it does not matter if propane uncertainty on 30 tonnes is /- 15 tonnesEU ETS Operator Experience 1 January 2015 EDF Energy plc. All rights Reserved 7 Key challenges and lessons learnt 1 The JEP approach and good relationship with the Environment Agency has prevented many potential major challenges - Calculated carbon vs analysed carbon / heat account and stock surveys - The very good application of the tier approach - Consequently EU ETS compliance is relatively straightforward no major change to existing systems nor need for capital investment Station compliance is co-ordinated by a team at the power station - This team has “oversight” and overall accountability for station compliance But to achieve station compliance requires far more than just a single team with oversight - It is a station effort and requires a number of competent personnel from other departments see next slideEU ETS Operator Experience 1 January 2015 EDF Energy plc. All rights Reserved 8 Key challenges and lessons learnt 2 How EU ETS compliance is delivered – key areas and how they link togetherEU ETS Operator Experience 1 January 2015 EDF Energy plc. All rights Reserved 9 Key challenges and lessons learnt 3 The key systems which EU ETS depends on need to be robust and those who are accountable for them need to fully consider the potential impacts to EU ETS compliance if they are requested to change these systems for other business objectives - Our technical records team have a very strong commitment and pride to their data being accurate and have numerous verification points in their process Needs to include contingency for “data gaps” - Problem weighbridge failure still need coal to come in. - Solution we already have more than one weighbridge for both rail and roadEU ETS Operator Experience 1 January 2015 EDF Energy plc. All rights Reserved 10 Key challenges and lessons learnt 4 Audit should not be seen as an audit - You do not want the auditor to identify improvements or find mistakes – an operator cannot get EU ETS wrong - It is purely to verify the emissions – that is the attitude needed - We do our own quarterly reviews – ensures active management and oversight of the systems which deliver EU ETS compliance - We involve, as much as possible, the people who work on EU ETS associated issues on a day-to-day basis in the audit to build auditor confidence that we all know what we are doing and there are no weaknesses in our management system

注意事项

本文(欧盟碳排放交易系统的运营经验:合规视角.pdf)为本站会员(石头哥)主动上传,环境100文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知环境100文库(点击联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2017 环境100文库版权所有
国家工信部备案号:京ICP备16041442号-6

收起
展开